Here is a list of all the sources of error, variability, and uncertainty and whether those sources—as far as I can see: which means I might be wrong, but willing to be corrected—are properly accounted for by the CRU crew, and its likely effects on the certainty we have in proxy reconstructions:
There you have it: all the potential sources of uncertainty (I’ve no doubt forgotten something), only one of which is accounted for in interpreting results. Like I’ve been saying all along: too many people are too certain of too many things.
- Source: The proxy relationship with temperature is assumed constant through time. Accounted: No. Effects: entirely unknown, but should boost uncertainty.
- Source: The proxy relationship with temperature is assumed constant through space. Accounted: No. Effects: A tree ring from California might not have the same temperature relationship as one from Greece. Boosts uncertainty.
- Source: The proxies are measured with error (the “on average” correlation mentioned above). Accounted: No. Effects: certainly boosts uncertainty.
- Source: Groups of proxies are sometimes smoothed before input to models. Accounted: No. Effect: a potentially huge source of error; smoothing always increases “signal”, even when those signals aren’t truly there. Boost uncertainty by a lot.
- Source: The choice of the model m(). Accounted: No. Effect: results are always stated the model is true; potentially huge source of error. Boost uncertainty by a lot.
- Source: The choice of the model m() error term. Accounted: Yes. Effect: the one area where we can be confident of the statistics.
- Source: The results are stated as estimates of β Accounted: No. Effects: most classical (frequentist and Bayesian) procedures state uncertainty results about parameters not about actual, physical observables. Boost uncertainty by anywhere from two to ten times.
- Source: The computer code is complex. multi-part, and multi-authored. Accounted: No. Effects: many areas for error to creep in; code is unaudited. Obviously boost uncertainty.
- Source: Humans with a point of view release results. Accounted: No. Effects: judging by the tone of the CRU emails, and what is as stake, certainly boost uncertainty.
Saturday, February 4, 2012
Sources of reconstruction uncertainty in CRU temperature proxy reconstructions
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment